Zinc Hotel
Construction of 135 hotel rooms, offices & retail with a building area of 22,000m2
Construction of 135 hotel rooms, offices & retail with a building area of 22,000m2
Extension of the sugar mill, in two phases, namely the addition of a Vertical Crystallizer
Construction of offices and conference room
2No. Boarding dormitories, Music Class Block, Half Olympic Size Swimming Pool with changing rooms, New
Unfurnished, within a four to ten storey high concrete framed building, aluminium doors and windows, ceramic floor tiles throughout, complete with concealed electrical wiring, main DB and basic light fittings, plumbing and drainage, white sanitary ware
Rate: – MUR 6,50M
Within a beach resort, comprising 130 to 160 rooms, two restaurants, a spa and gym and external amenities
Rate: – MUR 7,0M – 10,0M/Room
Comprising 110 to 140 rooms, three restaurants, a spa and gym and external amenities
Rate: – MUR 8,0M – 12,0M/Room
Comprising 90 to 120 rooms, four restaurants, a spa gym and hamam, tennis courts and external amenities
Rate: – MUR 12,0M – 18,0M/Room
Within a warehouse configuration
Rate: – MUR 130,000 tonne
6m high at eaves, overall 5,000m2
Rate: – MUR 20,000 – 25,000 /m2
Rate: – MUR 650/m2
Complete with hardwood structures, thatch, fire retardant and bird netting
Rate: – MUR 12,000/m2
Disclaimer for above: All prices are exclusive of 15% VAT.
The above information is given only on an indicative basis and should in no way be utilised to formulate business plans, estimates or otherwise be an aid to decision making towards a construction project. Cost Base date February 2020/2021
The company accepts no responsibility for any misuse that may result from the wrong interpretation of the data.